HVAC Systems
Even the best HVAC equipment and systems cannot compensate for a faulty rig. Problems of this type cause inherently high cooling and heating needs and consume unnecessary resources and should be corrected if possible. Izomarine offers you technical solutions and best experienced teams when it comes to planning, mounting and commissioning of HVAC systems.
The process of planning consists of dimensioning the pipes and equipment which is followed by mounting the Spiro tubes and equipment, connecting one to each other.
HVAC System commissioning
The key elements of commissioning include:
• Installation checks. Check installed equipment to ensure that all associated components and accessories are in place.
• Operational checks. Verify and document that systems are performing as expected, and that all sensors and other system control devices are properly calibrated.
• Documentation. Confirm that all required documentation has been provided, such as a statement of the design intent and operating protocols for all building systems.
• O&M manuals and training. Prepare comprehensive operation and maintenance (O&M) manuals, and provide training for rig operations staff.
• Ongoing monitoring. Conduct periodic monitoring after the school is occupied to ensure that equipment and systems continue to perform according to design intent.
Correctly implemented, commissioning is extremely cost-effective, and should improve the delivery process, increase systems reliability, improve energy performance, ensure good indoor environmental quality, and improve operation and maintenance of the facility.
Cold storage room
Izomarine offers complete solutions for designing, assembling, mounting equipment and commissioning for cold storage rooms. The technical knowledge and experience of our teams ensure full compliance with the rules and classification requirements.